EasyManua.ls Logo

York YVAA - Conducting the Optional Trace Gas Leak Test

York YVAA
178 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
JOHNSON CONTROLS
164
SECTION 9 - MAINTENANCE
FORM 201.28-NM1.1
ISSUE DATE: 1/31/2018
PROCEDURE WEEKLY QUARTERLY
SEMI-
ANNUALLY
ANNUALLY
EVERY 5
YEARS
EVERY *
HOURS
Check Oil Level in Oil Separator Sight
Glass.
X
Check Liquid Line Sight Glass/ Moisture
Indicator.
X
Check refrigerant level in the Evaporator
Sight Glass while running full load for 10
to 15 minutes.
X
Record System Operating Temperatures
& Pressures.
X
Check Condenser Coils for dirt / debris
and clean as necessary.
X
Check Programmable Operating
Setpoints and Safety Cutouts. Assure
they are correct for the application.
X
Check Compressor and Evaporator
Heater operation.
X
Check for dirt in the Panel. Check Door
Gasket sealing integrity.
X
**Leak check the Chiller. X
**Sample Compressor Oil, check for Acid,
and replace if necessary.
X
**Disconnect Power Source and Lock
Out. Check tightness of Power Wiring
connections.
X
Check Glycol concentration on Low Temp.
or other applications where freezing may
be a problem.
X
VSD Glycol Change. X
* Reserved for customer use for any special site requirements.
**This procedure must be performed at the specic time by an industry certied technician who has been
trained and qualied to work on this type of equipment. A record of this procedure be successfully carried out should be maintained on le by
the equipment owner should proof of adequate maintenance be required at a later date for warranty purposes.
MAINTENANCE REQUIREMENTS FOR
YVAA CHILLERS

Table of Contents

Other manuals for York YVAA

Related product manuals