EasyManua.ls Logo

Yudian AI-526 - Page 36

Default Icon
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
P2
2
nd
Proportional
band
The 2
nd
proportional band in PID and APID control. Instead of percentage of the
measurement range, the unit is the same as PV.
Generally, optimal P, I, D and CtI can obtained by auto tuning. They can also be
manually inputted if you already know the correct values.
1~32000
units
I2
2
nd
Time of
Integral
No integral effect when I=0
09999
seconds
d2
2
nd
Time of
Derivative
No derivative effect when d=0
0999.9
seconds
CtI2
2
nd
Control
period
Same description and function as parameter as Ctl
0.2
300.0
Sec
CHYS
Control
Hysteresis
CHYS is used for on-off control to avoid frequent on-off action of relay.
For a reverse acting (heating) system, when PV > SV, output turns off; when
PV<SV-CHYS, output turns on.
For a direct acting (cooling) system, when PV<SV, output turns off; when
PV>SV+CHYS, output turns on.
02000

Related product manuals