EasyManua.ls Logo

Zanotti Z200 - Required Tools for Unit Installation

Zanotti Z200
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Refrigeration unit
Series Zero Direct-Drive
Z200 | Z250 | Z350 | Z380
Z380 Multi
INSTALLATION MANUAL
rev.01
37
3 INSTALLATION
3.1 Tools required
Before proceeding with the installation of the unit on the truck, it is necessary to check that you have the
following tools available:
• Protective goggles and PPE
• Drill
• Drill bits
• Tape Metro
• Mechanical tools
• Ladder
• Work platform
• Lifting device
• Vacuum pump
• Dry nitrogen
• Torque wrench
• Torch
• Leak detector
DANGER
Always wear the appropriate PPE.

Table of Contents