EasyManuals Logo

Zendure AIO 2400 User Manual

Zendure AIO 2400
140 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
3. Important Tips
4. What’s in the Box
The solar PV system is grid-tied. Please check if it is allowed in your area. Depending on the region,

Please check the required accessories before installation, as some accessories need to be
purchased separately.

the power to the Microinverter.
After AIO 2400 installation, it will take about 5 minutes before it can be connected to the grid, and
the data will be synchronized to the Zendure App within 20 minutes.

The output to Microinverter should not be greater than the rated power of your Microinverter.

removing.
AIO 2400 Wrench for Removing MC4
Connectors
30cm MC4
Output Cable × 4
AIO 2400 Bracket
Combination Set
User Manual
AIO 2400 should be protected from direct sunlight to prevent rapid temperature increase.
!
support@z endure.com
EN

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zendure AIO 2400 and is the answer not in the manual?

Zendure AIO 2400 Specifications

General IconGeneral
BrandZendure
ModelAIO 2400
CategoryStorage
LanguageEnglish