EasyManua.ls Logo

Zero Zone CRYSTAL MERCHANDISER RVMC30D - Installation and Operation; Delivery Inspection; Installation Location

Default Icon
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 • Installation & Operation
INSTALLATION & OpERATION
Delivery Inspection
These display cases were carefully factory-tested, inspected, and properly packed to ensure delivery in the best possible condition. The
equipment should be unpackaged, uncrated, and checked for damage immediately upon delivery. DAMAGE MUST BE NOTED AT TIME OF
DELIVERY, AND ALL CLAIMS FOR DAMAGES MUST BE FILED WITH THE TRANSPORTATION COMPANY, NOT WITH ZERO ZONE. The
carrier will supply necessary report and claim forms.
Do not leave, store, or hold case outdoors in direct sunlight or high ambient temperature. With the end panels on, the case is airtight;
the inside temperature of the case will increase, and the heat will be unable to escape. This could potentially cause any plastic (such
as PTM) inside the case to deform or warp.
Packaging
Numbered labels identify the order of cases in a lineup (See Figure 1). The rst number indicates the store order number. The second number
indicates the lineup. The third number indicates the joint in a lineup (from left to right, when viewed from the front of the case). Back-to-back
cases follow the same labeling.
The rst case in the lineup (Case 1) has a packet shipped inside the case that contains the manual, special instructions for installing optional
features, and touch-up paint for custom-painted cases. Other cases in the lineup contain specic information for that case. The shop order is
taped to each case’s right-hand door.
Bumpers and kickplates are shipped on top of the case. Shelves are tie-wrapped and blocked inside the case for shipping. Other accessories
like drain traps, drain pans, condensate evaporation pans, and hat channel rails are shipped in cases that require those parts.
Materials for joining cases—including caulk, joining bolts, splices, and end ller posts—are shipped in each case to be joined.
The door is prevented from opening during shipment with the use of a door-holding shipping bracket. The bracket is screwed to the top of the
case at each door and should be removed when the case is unpacked.
Location
Cases must not be installed in the direct rays of the sun or near a source of radiant heat.
Be certain that the oor under the installation is of sufcient strength to prevent sagging. Uneven surfaces will result in reduced performance.
Cases should be set to allow a minimum 3" of space behind the back of the unit(s). This will allow necessary air to circulate behind the display
case(s) and prevent condensation. Higher humidity stores with minimal air circulation require at least a 4" gap. Recommended minimum 2" gap
between cases on end-to-end installations.
INSTALLATION & OpERATION
FIGURE 1: Case Label Information

Related product manuals