EasyManua.ls Logo

Zip 5253UK - Page 26

Zip 5253UK
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk www.zipwater.co.uk
Note When removing hose, take care not to
lose plastic olive from the fitting.
After replacing a cylinder or
after making a gas connection,
perform a leak test to check for gas leaks
between regulator and cylinder, and between regulator and
braided hose.
Stage 1
Turn the gas off.
Using soapy water applied with a sponge, or with a
brush, cover all of the gas joints with a liberal
amount of suds.
Stage 2
Turn the gas on.
Inspect the joints for leaks.
If any bubbles appear to grow, the joint will need to be
resealed and tested again.
Test for leaks at these two points
Leak test
CO2 Regulator
!

Related product manuals