EasyManua.ls Logo

Zip HydroTap BCS Series User Manual

Zip HydroTap BCS Series
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
802265US v1.27 06.21 BCS, BCS100-75 Install Instructions Page 1 of 36
BCS100/75 and BCS Series
Zip HydroTap
Installation and Operating Instructions
®
Scan QR Code to download the latest version of this document.
English French

Questions and Answers:

Zip HydroTap BCS Series Specifications

General IconGeneral
Filtered WaterYes
Safety LockYes
Power Supply220-240V, 50Hz
Boiling Water Temperature98°C
Chilled Water Temperature5-10°C
Sparkling Water CapacityNot applicable
Warranty2 years
Finish OptionsBrushed Chrome, Matte Black
Product TypeBoiling, Chilled & Filtered Water System
Water Pressure250kPa - 700kPa
Filtration0.2 micron filter
DimensionsVaries by model
Temperature ControlAdjustable

Summary

HydroTap Specifications and Overview

Installation Checklist

Checklist of items and conditions required before installation.

Important Safety Instructions

Critical safety guidelines for installation and operation.

Warnings and Regulatory Information

Compliance information and general warnings.

Major Components and Accessories

List and description of included parts and optional accessories.

Before Installation and Site Requirements

Prerequisites and site preparation guidelines before installation.

Section 1: Faucet Installation

Section 2: Ventilation Requirements

Section 3: CO2 Gas Cylinder Installation

CO2 Cylinder Storage Safety Warning

Essential safety advice for storing CO2 gas cylinders.

Securing the CO2 Cylinder Cradle

Instructions for safely mounting the CO2 cylinder.

Connecting the CO2 Regulator Assembly

Steps to attach the regulator to the CO2 cylinder.

Connecting the CO2 Gas Hose

Procedure for linking the gas hose from regulator to unit.

Testing for CO2 Gas Leaks

Method to detect gas leaks at connections using soapy water.

Performing a Gas Leak Test

Detailed steps for conducting a gas leak test after connections.

Section 4: Command Center Installation

Electrical Power Supply Connection

Guidance on connecting the appropriate electrical power cable.

Hose and Tube Fitting Instructions

Procedures for fitting water hoses and using tube connectors.

Section 5: HydroTap Commissioning

CO2 Gas Purge Procedure

Steps to purge CO2 gas from the system.

New Filter Cartridge Flush Procedure

Procedure for flushing the newly installed filter cartridge.

Boiling Water Calibration Process

Procedure to calibrate the boiling water temperature.

Backflow Prevention Systems Overview

Explanation of integral and required backflow prevention systems.

Troubleshooting and Product Disposal

Product Warranty Information

Warranty Terms and Conditions

Related product manuals