EasyManua.ls Logo

Zip HydroTap BCS Series - Stop Cock Operation for Filter Flush; Boiling Water Calibration Process

Zip HydroTap BCS Series
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
802265US v1.27 06.21 BCS, BCS100-75 Install Instructions Page 21 of 36
5.3 - Boiling Calibration
Commissioning
Press the calibration button and the system will
commence the Boiling calibration procedure. This will
take approximately 5-6 minutes.
5.4 - Booster
NOTE: This product does not have a booster option.
When asked if a booster is installed, make sure NO is
selected.
BC Sparkling
10:30 Wed 04,Jul 2018
BC Sparkling
10:30 Wed 04,Jul 2018
NOTE: For any subsequent lter changes or any operational procedures, please refer to the HydroTap user
guide, located inside the lter housing access door.
OPEN
CLOSED
Stop cock operation
1. Turn the flush line stop cock ON (See diagram).
2. Press [Start] and allow at least 10 liters (2.6 gallons) of
water to flush through the filter.
3. The product details will be displayed in the screen.
4. Once the filter flush is finished, Turn the stop cock OFF
then press [Stop] to end filter flush mode.

Related product manuals