EasyManua.ls Logo

Zip 5253UK - Installation Checklist

Zip 5253UK
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
Installation instructions
805845UK V1.02 July 2018 - G4 Command Centre
Technical support
Tel: 0345 6 005 005 Email: service@zipindustries.co.uk www.zipwater.co.uk
Before installation
Read the instructions and check if there is adequate space to install all of the components.
Note Not all fittings are supplied with the appliance kit. Isolation valves are not supplied.
Check the mains water pressure is within min / max requirements (see page 11).
Check the water quality to determine if extra filtration will be required.
Note This product must be fitted to a wholesome water supply.
Check the Command Centre rating plate and ensure correct power is available.
Check the under counter cupboard floor supporting the Command Centre is adequate for its total
weight, when full of water.
Before commissioning
Check the system has been installed correctly.
Check all plumbing fittings for water tightness.
Ensure the outlet and vent pipes are positioned to drain correctly.
Ensure there is adequate ventilation.
Check all tubes and pipes from the Command Centre to the tap have a constant rise and there are
no sags or kinks in the hoses.
Check all electrical connections are correct and there are no loose wires.
Commission (see section 8)
Flush the supply line before connecting.
Turn on the water and check for leaks.
Flush the filter(s).
Activate / enable the booster (if fitted).
Calibrate the safety sensor for boiling models.
Where applicable, programme the Command Centre to suit the customer’s requirements.
Installation checklist

Related product manuals