Quick Start Installation Guide
807119 v1.08 05.23 G5 BCS Quick Start Guide
19
Booster
SECTION 11: Connect the Booster
Hold connections
with spanner
while tightening hoses
3/8" BSP
connections
Booster
Do not switch on electrical power until commissioning.
Do not over tighten hose connections.
Braided hoses supplied cannot be lengthened.
Cold water into booster,
connect to Command Centre
BYPASS OUT
see pages 26-29
Hot water out of booster,
connect to Command Centre
BYPASS IN
see pages 26-29
Strainer
Connect electricity