WWW.ZIPPITY-OUTDOOR.COM
9
ASSEMBLY
INSTRUCTIONS
ZP19038
STEP 5:
GATE WINGS INTO THE GROUND
STEP 5.1
using a claw hammer (or something
equivalent) as illustrated. Add water to
loosen the soil if necessary.
Use a block of wood
to protect the top of
the posts, and gently
hammer each gate wing
equally into the ground
until the bottom rails
are about 2” above the
ground.
3 8 ¹¹/₁₆”
3 8 ¹¹/₁₆”
4 0³/₁₆”
STEP 5.2 STEP 5.3