EasyManua.ls Logo

ZKTeco CMP-200 Series - 7 Control Board Wiring Installation

ZKTeco CMP-200 Series
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CMP-200 User Manual
Page | 15 Copyright©2020 ZKTECO CO., LTD. All rights reserved.
7 Control Board Wiring Installation
Remove the wiring cover of the barrier gate main controller.
Refer to the wiring diagram of the barrier gate controller and connect the
lines one by one firmly. (Note: Power must be disconnected before
installation or maintenance.)
After checking and confirming reliable wiring, install the wiring cover
back.
Install the Desktop Remote Control: Place the Desktop Remote Control on
the table in the guard room or attach it to the wall and plug-in the power.
The wiring diagram of the controller is as follows:

Related product manuals