CMP-200 User Manual
Page | 15 Copyright©2020 ZKTECO CO., LTD. All rights reserved.
7 Control Board Wiring Installation
• Remove the wiring cover of the barrier gate main controller.
• Refer to the wiring diagram of the barrier gate controller and connect the
lines one by one firmly. (Note: Power must be disconnected before
installation or maintenance.)
• After checking and confirming reliable wiring, install the wiring cover
back.
• Install the Desktop Remote Control: Place the Desktop Remote Control on
the table in the guard room or attach it to the wall and plug-in the power.
The wiring diagram of the controller is as follows: