EasyManuals Logo

Zoomlion ZCC2600CR User Manual

Zoomlion ZCC2600CR
428 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #91 background imageLoading...
Page #91 background image
S
a
fe
ty
G
u
i
d
e
l
i
n
e
s
Operator’s Manual for Crawler Crane
3.10 Underground cables
With special equipment, the equipment can also be used for underground working.
With underground working, it is possible to damage:
a) Underground electric cables
b) Gas pipes
c) Telephone, TV, and data cables
d) Sewage pipes, district heating supply, etc.
WA
RNI
NG
If a live underground cable is damaged, lives are at risk from electric shock.
There is an extreme danger of explosion and fire in the vicinity of a damaged gas pipe.
Measures to be taken during operational planning:
The construction company doing the work is responsible for gathering accurate information
about possible underground cables within the working area of the equipment so that work can
be done safely:
a) Obtain the relevant information from the relevant utility companies.
b) Examine the "as completed" plans of:
1) Utility companies (electricity, gas or water)
2) Cable users (telephone companies, factories, transport companies)
3) Building authorities.
c) Only use the latest, up-to-date plans.
d) If there are any deviations or extensions to a project, initiate new inquiries.
e) If in doubt, localize the underground cables around the site using a locating device via
search slots or test digs.
f) The relevant utility companies, cable users and public authorities:
Must be informed in good time about the start of the work.
Must be asked for written approval for the civil engineering work to be done.
g) When several construction companies are involved, their activities must be coordinated.
All companies must have the same up-to-date information on underground pipes, etc. on
the construction site.
Safety precautions and protective measures when operating the equipment near underground
cables
a) Do not start work until you have obtained all the approvals from the utility companies and
the cable users.
b) The equipment operator must obtain all relevant information about the exact location of all
underground cables before starting work. These plans must be readily accessible at the
construction site.
3-49

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zoomlion ZCC2600CR and is the answer not in the manual?

Zoomlion ZCC2600CR Specifications

General IconGeneral
BrandZoomlion
ModelZCC2600CR
CategoryConstruction Equipment
LanguageEnglish

Related product manuals