EasyManua.ls Logo

Zte MC7010CA - Installation Check; Device Installation Checks; Cable Installation Checks

Zte MC7010CA
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
Installation Check
Device Installation:
The MC7010CA is installed firmly.
The network cables are installed firmly.
The cover plate on the device is installed.
The nano-SIM card is installed.
The network interface on the POE adapter is installed correctly.
CablesInstallation:
Verify that all cables are connected properly, cable connectors aresecure.
Cables should be laid in aclear and straight manner without crossing each other. There is no
obvious curve or slant. Cables do not hang in the air or cross each other.

Related product manuals