The end position of the nozzle ring(56001) in the turbine casing(51000) can be checked via
dimensionH.
Fig.50: Measuring the end position of the nozzle ring
Product Dimension H [mm]
A130-H 11.00
A135-H 13.50
A140-H 16.50
Table38: End position of the nozzle ring, control dimension H
1. Measure dimension H as shown in the illustration and compare it with the minimum di-
mension H in the table.
9.14 Installing the cartridge group
Lifting the cartridge group and rotating it by 90°
Fig.51: Lifting the cartridge group and rotating it by 90°
1. Loosen and remove nuts.
2. Lift the cartridge group out of the service support(90012).
3. Insert the screws of the service support from above and fit ring nuts(VRM) with washers.
4. Attach lifting gear to the ring nuts(VRM).
5. Lift cartridge group at the side of the ring nuts(VRM) and turn it into a vertical position.