EasyManua.ls Logo

ABB A135-M66 - Fig. 58: Installing the Cartridge Group; Table 41: Tightening Torque (51007)

ABB A135-M66
152 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / A130-M.. - A145-M..
9 Dismantling and fitting / 9.15 Installing the cartridge group
© Copyright 2022 ABB. All rights reserved. HZTL4031_EN Rev.P February 2022
Installing the cartridge group
Fig.58: Installing the cartridge group
Product Size Tightening torque [Nm]
A130 M8 25
A135 M10 45
A140 M12 75
A145 M12 75
Table41: Tightening torque (51007)
1. Coat the threads of the studs(51006) with high-temperature grease.
2. Align the casing position of the cartridge group to the marking.
3. Lower the cartridge group into the turbine casing.
4. Remove ring nuts and screws.
5. Fit fastening strips(51002) with Verbus Ripp® washers(51003) and hexagon
nuts(51007).
6. Tighten the hexagon nuts(51007).
Page 109 / 149

Table of Contents

Related product manuals