ACH550-PCR/PDR User’s Manual 3-9
Installation
Installation flow chart
The installation of Input Disconnect configurations for ACH550 drives follows the
outline below. The steps must be carried out in the order shown. At the right of each
step are references to the detailed information needed for the correct installation of
the unit.
Note: References in the middle column below are to the ACH550-UH Users
Manual. References in the third column below are to this manual.
Task
Refer to the ACH550-UH
Users Manual Installation
section
Additional Reference in this
Manual
PREPARE for
installation
Preparing for installationDrive identification on page 3-10.
Note: Some instructions in this
document vary, depending on
the drive’s frame size. To read
the Ratings table, you need the
“Output current rating” entry from
the Type code (see page 3-10).
Also see Suitable mounting
location on page 3-11.
PREPARE the mounting
location
Prepare the mounting
location
--
REMOVE the front cover Remove front cover --
MOUNT the drive Mount the drive --
INSTALL wiring Wiring overview and
Install the wiring
Installing the wiring (supplement to
ACH550-UH User’s Manual) on
page 3-11.
CHECK installation Check installation --
RE-INSTALL the cover Re-install cover --
APPLY power Apply power --
START-UP Start-up --