EasyManua.ls Logo

ABB ACH580-34 - Installing Air Baffles; EU Declaration of Conformity

ABB ACH580-34
308 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Motor overload protection
Motor overload protection is not enabled by default. Motor overload protection can
be measured or estimated in one of the following ways: 1) using motor temperature
devices, 2) using a motor model defined by parameters, or 3) using motor current and
motor class curves. To enable protection using motor temperature devices or motor
model parameters, set parameter 35.11 and subsequent parameters through 35.55.
To adjust motor class curves (default is class 20), change parameters 35.56 and 35.57.
Use the information key (
?
) on the drive control panel for more information on setting
group 35 parameters. You must set the drive overload parameters correctly, or motor
damage can occur.
Fieldbus communication
To configure the embedded fieldbus communication for BACnet MSTP, you must set
at least these parameters:
DescriptionSettingParameter
Selects fieldbus as the source for the start and stop
commands when EXT1 is selected as the active control
location.
Embedded fieldbus20.01 Ext1 commands
Selects a reference received through the embedded
fieldbus interface as speed reference 1.
EFB ref122.11 Speed ref1 source
Selects a reference received through the embedded
fieldbus interface as torque reference 1.
EFB ref126.11 Torque ref1 source
Selects a reference received through the embedded
fieldbus interface as frequency reference 1.
EFB ref128.11 Frequency ref1
source
Initializes embedded fieldbus communication.BACnet MSTP58.01 Protocol enable
Modbus RTP
Node address. There must be no two nodes with the
same node address on-line.
1 (default)58.03 Node address
Defines the communication speed of the link. Use the
same setting as in the master station.
19.2 kbps (default)58.04 Baud rate
Selects the parity and stop bit setting. Use the same
setting as in the master station.
8 EVEN 1 (default)58.05 Parity
Validates any changed EFB configuration settings. Use
this after changing any parameters in group 58.
Refresh settings58.06 Communication
control
Other parameters related to the fieldbus configuration:
58.34 Word order58.28 EFB act1 type58.17 Transmit delay58.14 Communication
loss action
20 EN Quick installation and start-up guide
EN
DA
DE
ES
FI
FR
IT
NL
PL
PT
SV
TR
ZH

Other manuals for ABB ACH580-34

Related product manuals