EasyManua.ls Logo

ABB ACS800-67LC - Page 72

ABB ACS800-67LC
154 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
72 Electrical installation
Adapt modules, which
are to hold cables, by
peeling off layers until
you reach the gap seen
in the next picture. Try to
remove the same
number of layers on both
module halves.
Achieve a 0.1…1.0 mm
gap between the two
halves when held against
the cable.
Lubricate all modules for
the frame thoroughly on
both the inside and the
outside surfaces.
Mount the modules by
sliding them in through
the angled entry side of
the frame.
Mount the modules row
by row starting from the
inside. Precompress the
frame.
Lubricate the
compression units. Insert
one in the top of each
opening.
Tighten all compression
units alternately until full
stop, approx. 10 N·m
(7.4 lbf·ft).

Table of Contents