EasyManua.ls Logo

ABB AWT420 - Electrical installation; Earth bonding

ABB AWT420
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
AWT420 | UNIVERSAL 4-WIRE, DUAL-INPUT TRANSMITTER | INF/ANAINST/012-EN REV. A
…4 Hazardous area considerations
…Fitting the hazardous location EZLink bulkhead connector
Referring to Figure 7:
7 Fit alignment tab I into gland plate slot K into the casting
slot.
8 Insert EZLink bulkhead connector body L fully into cable
entry and align the bulkhead connector body using the flats
on the alignment washer (see , item H).
9 Screw back nut J onto bulkhead connector body and


Figure 7 Securing the EZLink bulkhead connector cable
Referring to Figure 8:
10 Place EZLink cable plug M into EZLink bulkhead connector
block cradle A.
11 Attach EZLink bulkhead cable bung O to cable loom and
push bung forward to cover connection plug M.
12 Plug assembled connector block cradle/cable plug/bung
into EZLink module P.
Figure 8 Connecting the EZLink cable assembly
Referring to Figure 7:
13 Push EZLink bulkhead label Q onto bulkhead connector
body R.
14 Fit bulkhead dust cap S onto bulkhead connector body R.
15 
16 Close and lock transmitter door B.
K
I
J
L
Q
R
S
B
I
A
M
O
P
A

Other manuals for ABB AWT420

Related product manuals