EasyManua.ls Logo

ABB REB670 - Section 13 Reset; Reset Busbar Protection Open Current Transformer; Reset Open CT in Zone a (Three Phase); Reset Open CT in Zone B (Three Phase)

ABB REB670
116 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 13 Reset
About this chapter
This chapter describes how to reset the IED and when this is necessary.
13.1 Reset busbar protection open current transformer
13.1.1 Reset open CT in Zone A (Three phase)
Main menu/Reset/Reset BBP open CT/BBPZoneA3Ph(PDIF, 87B)/
BZNTPDIF_A:x
Resetting the three phase open CT in zone A is done here.
13.1.2 Reset open CT in Zone B (Three phase)
Main menu/Reset/Reset BBP open CT/BBPZoneB3Ph(PDIF,87B)/
BZNTPDIF_B:x
Resetting the three phase open CT in zone B is done here.
13.1.3 Reset open CT in Zone A (Single phase)
Main menu/Reset/Reset BBP open CT/BBPZoneA1Ph(PDIF,87B)/
BZNSPDIF_A:x
Resetting the single phase open CT in zone A is done here.
13.1.4 Reset open CT in Zone B (Single phase)
Main menu/Reset/Reset BBP open CT/BBPZoneB1Ph(PDIF,87B)/
BZNSPDIF_B:x
Resetting the single phase open CT in zone B is done here.
1MRK505209-UEN E Section 13
Reset
91
Operator's manual

Table of Contents

Other manuals for ABB REB670

Related product manuals