EasyManua.ls Logo

ABB RED670 - Page 14

ABB RED670
308 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Checking the operation of the du/dt and di/dt based
function ................................................................................218
Completing the test
.............................................................. 219
Fuse failure supervision VDSPVC.............................................219
Completing the test.............................................................. 220
Control............................................................................................ 220
Synchrocheck, energizing check, and synchronizing
SESRSYN................................................................................. 220
Testing the synchronizing function....................................... 223
Testing the synchrocheck functionality.................................223
Testing the energizing check................................................226
Testing the voltage selection................................................227
Completing the test.............................................................. 229
Autorecloser for 1/2/3-phase operation SMBRREC ................. 230
Preparation of the verification ..............................................232
Switching the auto recloser to On and Off
On
and
Off
......... 232
Verifying the auto recloser ...................................................232
Checking the auto reclosing conditions................................233
Completing the test.............................................................. 235
Apparatus control APC.............................................................. 235
Single command, 16 signals SINGLECMD............................... 236
Interlocking................................................................................ 236
Scheme communication................................................................. 236
Scheme communication logic for distance or overcurrent
protection ZCPSCH .................................................................. 236
Testing permissive underreaching....................................... 237
Testing permissive overreaching..........................................237
Testing blocking scheme......................................................237
Testing delta blocking scheme............................................. 238
Checking of unblocking logic................................................238
Completing the test.............................................................. 239
Phase segregated scheme communication logic for
distance or overcurrent protection ZC1PPSCH ........................239
Testing permissive underreaching....................................... 239
Testing permissive overreaching..........................................240
Testing blocking scheme......................................................240
Completing the test.............................................................. 240
Current reversal and Weak-end infeed logic for distance
protection 3-phase ZCRWPSCH .............................................. 241
Current reversal logic........................................................... 241
Weak end infeed logic.......................................................... 242
Completing the test.............................................................. 242
Local acceleration logic ZCLCPSCH.........................................243
Verifying the settings............................................................ 243
Table of contents
8 Line differential protection RED670 2.2 IEC
Commissioning manual

Table of Contents

Other manuals for ABB RED670

Related product manuals