EasyManua.ls Logo

ABB RED670 - Starting Up the IED; Factory and Site Acceptance Testing

ABB RED670
308 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IEC 61850 or
function name
ANSI Function description Line Differential
RED670
(Customized)
RED670 (B33)
RED670 (A42)
RED670 (B42)
RED670 (C42)
RANGE_XP Measured value expander block 66 66 66 66 66
SSIMG 63 Insulation supervision for gas
medium
21 21 21 21 21
SSIML 71 Insulation supervision for liquid
medium
3 3 3 3 3
SSCBR Circuit breaker condition
monitoring
0-6 6 3 6 3
LMBRFLO Fault locator 1 1 1 1 1
I103MEAS Measurands for IEC
60870-5-103
1 1 1 1 1
I103MEASUSR Measurands user defined
signals for IEC 60870-5-103
3 3 3 3 3
I103AR Function status auto-recloser
for IEC 60870-5-103
1 1 1 1 1
I103EF Function status earth-fault for
IEC 60870-5-103
1 1 1 1 1
I103FLTPROT Function status fault protection
for IEC 60870-5-103
1 1 1 1 1
I103IED IED status for IEC 60870-5-103 1 1 1 1 1
I103SUPERV Supervison status for IEC
60870-5-103
1 1 1 1 1
I103USRDEF Status for user defined signals
for IEC 60870-5-103
20 20 20 20 20
L4UFCNT Event counter with limit
supervision
30 30 30 30 30
TEILGAPC Running hour meter 6 6 6 6 6
Metering
PCFCNT Pulse-counter logic 16 16 16 16 16
ETPMMTR Function for energy calculation
and demand handling
6 6 6 6 6
1MRK 505 378-UEN A Section 3
Available functions
Line differential protection RED670 2.2 IEC 41
Commissioning manual

Table of Contents

Other manuals for ABB RED670

Related product manuals