Operation Manual / TPL67-C.. - TPL71-C..
Disassembly and assembly
8
Dismantling and fitting nozzle ring at
turbine end
8.8
Page 110
© Copyright 2017 ABB. All rights reserved.
February 2017 HZTL2488_EN Revision D
Assembly
Carefully clean grooves and contact surfaces in / on casing and keep
free from metal chips.
Keep grooves and spiral-wound gasket free from oil and grease.
Fix a
new
spiral-wound gasket (61050) using a little instant adhesive
(for example "Loctite 454 gel") applied at three equally spaced points
in groove.
Fit nozzle ring to gas inlet casing and fix it.
Fit gas inlet casing.
Use guide studs (90320) as a centering aid and remove them after-
wards.
Brush screw threads (61044) with high temperature grease.
Position segments (51012) using screws (61044).
Make sure that collars (C) of segments (51012) rest in groove (S).
Position screws (61044).
1) If provided
Segment connection
Checking
Flange connection

Table of Contents

Other manuals for ABB T566609

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB T566609 and is the answer not in the manual?

ABB T566609 Specifications

General IconGeneral
BrandABB
ModelT566609
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals