5.3
Page 60
© Copyright 2017 ABB. All rights reserved.
February 2017 HZTL2488_EN Revision D
Wet cleaning using external water-pressure vessel (XC3)
Operating state prerequisites for wet cleaning XC3
NOTICE
To be able to carry out a satisfactory cleaning process which has been
tested and is recommended by ABB Turbo Systems, the following pre-
requisites must be fulfilled:
Engine load 50 ... 85%
Start of cleaning cycle in accordance with following description for
wet cleaning operation with XC3.
Operating procedure for compressor wet cleaning with XC3
The operating state prerequisites for compressor cleaning with XC3
must be fulfilled.
Remove sealing plug (X).
Fill vessel with required volume of clean water (see
table Cleaning pa-
rameters
).
5.3.2
Operating the water
pressure vessel

Table of Contents

Other manuals for ABB T566609

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB T566609 and is the answer not in the manual?

ABB T566609 Specifications

General IconGeneral
BrandABB
ModelT566609
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals