EasyManua.ls Logo

ABB TPL65-A32 - Page 43

ABB TPL65-A32
129 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / TPL65-A32 / -A33 / -A36 + TPL69-A32 / -A33
Operation
4
Servicing work
4.2
Page 41
September 2014 HZTL2498_EN Revision A
Service work every 8000 … 12000 hours
The inspection and assessment of the rotor and the bearing parts must be
carried out by an official ABB Turbocharging service station.
Disassemble turbocharger.
Measure clearances.
Clean the turbine and compressor wheels and inspect for damage.
Clean the turbine and compressor casings and inspect for any cracks
and erosion or corrosion.
Clean bearing casing and blow air through oil ports.
Clean nozzle ring and check for cracks and erosion.
Inspect and assess bearing parts and rotor.
Service work every 24000 … 36000 hours
The replacement of bearing parts as well as the inspection and
assessment of the rotor must be carried out by an ABB Turbocharging
Service Station.
Disassemble turbocharger.
Measure clearances.
Clean the turbine and compressor wheels and inspect for damage.
Clean the turbine and compressor casings and inspect for any cracks
and erosion or corrosion.
Clean bearing casing and blow air through oil ports.
Clean nozzle ring and check for cracks and erosion.
Inspection and assessment of the rotor
Replace plain bearings with original parts from ABB Turbo Systems.
4.2.4
4.2.5
© Copyright 2014 ABB. All rights reserved.

Table of Contents

Related product manuals