EasyManua.ls Logo

ABB TPL69-A30 - Page 100

ABB TPL69-A30
139 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30
8 Disassembly and assembly / 8.6 Dismantling and installing the tur-
bine diffuser and nozzle ring
© Copyright 2018 . All rights reserved. HZTL2481_EN Revision C May 2018
u Replace two screws (61056) in the gas outlet casing with two guide
studs (90320) in the upper section of the turbine diffuser (63000).
u Fit clamps (90921) over guide studs (90320) and studs (61036)
u To secure the work, screw the nuts (61037) onto the start of stud
threads (61036).
u Remove the remaining screws (61056) and Verbus Ripp® washers
(61057).
u Press the turbine diffuser (63000) free using the press-off screws
(90901) and pull it out it until the clamp (90921) is up against the nut
(61037).
u Loop the lifting gear around the turbine diffuser (63000) and secure it
to a crane.
u Remove the nuts (61037) and clamps (90921) from the studs.
u Fully withdraw the turbine diffuser and remove it.
u Remove clamps (90921) and guide studs (90320).
Page 98 / 136

Table of Contents

Related product manuals