Operation Manual / TPL85-B14/-B15/-B16
Cleaning turbine blades and nozzle ring
in operation
© Copyright 2016 ABB. All rights reserved.
May 2016 HZTL2491_EN Revision B
1 Water supply (fresh water only) 8
Drain pipe
2 Regulating valve 9
Drain cock
3 Manometer 10
Drain
5 Stainless-steel piping 11
Orifice (integrated into turbocharger)
6 Other turbochargers 21
Air line from the compressor casing
7 Injection nozzle item 7a or 7b A
Position 2
Before cleaning, the
Operating state prerequisites for wet cleaning
must be met.
Check that the water supply (1) is open and safeguarded and that it is
also connected to the regulating valve (2) before the turbocharger.
Set drain cock (9) of drain pipe (8) on gas outlet casing to
and check whether exhaust gas escapes.
Quickly open regulating valve (2) until manometer (3) indicates follow-
ing pressure: injection nozzle (7a)
(injection
nozzle 7b) at constant engine output.
Check whether the exhaust gas temperature decreases following the
turbine.
Operating the wet
cleaning system