Operation Manual / TPS44-F.. - TPS61-F..
Turbine cleaning during operation
Page 63
April 2015 HZTL2412_EN Revision E
Recommended operating state for turbine wet cleaning
The following operating state has been tested and is approved by ABB
Turbo Systems:
Characteristic / component
short
water injection time
long
water injection time
Engine load (guide value) 20 … 40 %
Turbine inlet temperature
T
TE
before water injection
Water supply ensured
(overpressure over
atmosphere) p
WT
If necessary, engine performance must be reduced to maintain these
conditions.
The cleaning cycle can now be started based on the following description.
© Copyright 2015 ABB. All rights reserved.