8
6 INSTALLATION
Steps of installation
- Preparing installation
- Installing the mounting plate if needed
- Mounting the operator and the arm
- Connecting the operator to mains
- Commissioning
- Testing
- Connecting impulse devices
Preparing installation
- Check the correct function
of the door
- Hinges
- Door clearance
- Check the correct function
of the lock
- Lock case
- Striker plate
- Suitability of the
lock’s function
Removal of housing
Note! Remove the protective earth wire from cover and connect it back after
installation.
Ensure the mains disconnected when removing or re-fi tting the cover.