9
INSTALLATION
Tools required
Drill
Set of ball ended allen wrenches
# 2 Phillips head screwdriver
Flat blade screwdrivers, 2 pcs
Steps of installation
- Preparing installation
- Installing the mounting plate
- Mounting the operator and the arm
- Connecting the operator to mains
- Commissioning
- Testing
- Connecting impulse devices
Preparing installation
- Check the proper function of the door
- hinges
- door clearance
- Check the proper function of the lock
- lock case
- striker plate
Removal of housing
Note! Remove the protective earth wire from cover and connect it back after installation.
Keep the mains disconnected when removing or mounting cover.