4.2 Assembly Procedures
Preparation before assemble:
1.Clean the room for work
2.Identify the area for material
3.Prepare the implement, equipment, materials as bellow
1) working table
2) Screw-driver
3) Knife
4) glove
5) cleaning cloth
6) ESD protection
After unplugging the power cord, the power board still have power energe. Please pay attention
when disassembling/assembling.
S1
Assemble I/F BD and P/BD
to SHD.
Before Disassembling & Assembling, monitor need to be put on the sponge
and the Insulation glove must be wore during the process.
Put the SHD on the worktable.
Insert P/BD wire to the Power BD as the picture 1.
Locate the Power BD into the SHD as the picture 2.
Insert FFC LVDS to the I/F BD as picture 3.
Insert the wire on the P/BD to the I/F BD, locate the I/F BD into the SHD and lock 5
screws as the picture 4.
Lock 2 screws as the picture 5.
PICTURE 1 PICTURE 2 PICTURE 3 PICTURE 4
PICTURE 5
P/BD
P/BD
I/F BD