EasyManuals Logo

Acorn 80 Installation Manual

Default Icon
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #5 background imageLoading...
Page #5 background image
5
ACORN 80 Installation Manual
INSTALLATION FLOW CHART
ONLY ACORN TRAINED ENGINEERS SHOULD CARRY OUT STAIRLIFT INSTALLATIONS. ALL
STATUTORY RULES AND REGULATIONS CONCERNING SAFETY, ELECTRICAL WORK OR
ENVIRONMENTAL PROTECTION MUST BE OBSERVED.
1 Ensure that you have the correct installation drawing.
2 Check all components received are correct and match the drawing and check sheets.
3 Carefully remove the lift components from their packaging.
A suggested tool list is included in the Appendices.
RAIL INSTALLATION
FIT CARRIAGE TO RAIL
FIT SEAT TO CARRIAGE
FIT RAIL EQUIPMENT
PROGRAM THE LIFT
TESTING & COMPLETION
SECTION 2
Installation Flow Chart
Before Starting An Installation

Other manuals for Acorn 80

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Acorn 80 and is the answer not in the manual?

Acorn 80 Specifications

General IconGeneral
Safety Featuresseatbelt
Speed0.15 m/s
Seat TypePadded
FootrestFlip-up
FoldableYes
Color OptionsBeige
Power SupplyBattery powered (2 x 12V sealed lead acid batteries)

Related product manuals