B. Boiler
Standard boiler electrodes have a MNPT stainless steel bushing and are supplied with a FNPT cross
GHVLJQHGIRUPRXQWLQJLQWKHVNLPPHUVXUIDFHEORZGRZQOLQH6DPSOLQJRIWKHERLOHU¶VZDWHUFDQEH
DFKLHYHGXVLQJRQHRIWZRW\SLFDOSOXPELQJFRQ¿JXUDWLRQVFRQWLQXRXVVDPSOLQJRUWLPHGDQGRUVDPSOH
& hold). For a successful installation, it is critical to observe the recommended distances and pipe sizes
provided in the installation drawings.
)RUEHVWUHVXOWVWKHHOHFWURGHFURVVVKRXOGEHPRXQWHGLQD´VNLPPHUEORZGRZQOLQHZLWKLQ¶RI
WKHERLOHU6PDOOHUOLQHVL]HVDQGJUHDWHUGLVWDQFHVPD\DႇHFWWKHUHVSRQVHWLPHDQGDFFXUDF\RIWKH
HOHFWURGH$ÀRZWKURWWOLQJGHYLFHGRZQVWUHDPIURPWKHSUREHZLWKLQLQFKHVLVUHTXLUHGWRHQVXUHWKDW
the electrode is exposed to water and not steam. Properly installed and adjusted, this device will prevent
ÀDVKLQJLQWKHHOHFWURGHFKDPEHU
NOTES:
1. Install a fully ported type valve between the electrode and the boiler. This
allows the electrode to be isolated for removal and cleaning.
$ÀXVKLQJOLQHDQGï»๛WXUQW\SHEDOOYDOYHVKRXOGEHLQVWDOOHGLQWKHERWWRPRIWKH
FURVVWRSHULRGLFDOO\³ÀXVK´VHGLPHQWIURPWKHHOHFWURGHFKDPEHU
0DNHVXUHWKHDOLJQPHQWDUURZVRQWKHSUREHHQGXSSDUDOOHOWRWKHÀRZIRU
best performance.
WARNINGS:
1. The probe must be fully immersed in the system water to read correctly.
6WHDPÀDVKLQJZLOOUHVXOWLQLQFRUUHFWUHDGLQJV
2. Do not exceed a maximum water temperature of 436°F (224°C)
3. Do not exceed a maximum pressure of 350 psi (24.1 bar)
4. A throttling device must be installed down stream from the elecrode.
Boiler Conductivity Electrodes
BE-4RTD and BE-32
Wiring Note: BE-4RTD probes require a 6 conductor cable from controller to probe, BE-32 probes only
require a 2 conductor cable.