Installation by qualified technician, adhere to safety rules and national standards.
Essential requirements for electrical connections, including circuit breakers and earthing.
Precautions before electrical connection and initial start-up procedures.
Checks before powering up the unit, including safety and fixation.
Checks after powering up, including voltage and compressor heater operation.
Steps for initiating the unit's first start-up after thorough checks.
Operational checks on refrigerant circuit, superheat, and discharge temperature.
Verifying operation of safety devices like high pressure pressostat and anti-freeze.
Guide to changing user-configurable parameters on the control board.
Guide to changing installer-specific parameters on the control board.