28 7820A GC Site Preparation Guide
2 7693A Automatic Liquid Sampler Site Preparation
Customer Responsibilities
The specifications in this manual outline the necessary space,
electrical outlets, tubing, operating supplies, consumables, and
other usage-dependent items such as vials, syringes, and
solvents required for the successful installation of instruments
and systems.
If Agilent is delivering installation and familiarization services,
users of the instrument should be present throughout these
services; otherwise, they will miss important operational,
maintenance, and safety information.
If Agilent is delivering installation and familiarization services,
delays due to inadequate site preparation could cause loss of
instrument use during the warranty period. In extreme cases,
Agilent Technologies may ask to be reimbursed for the
additional time required to complete the installation. Agilent
Technologies provides service during the warranty period and
under maintenance agreements only if the specified site
requirements are met.
Dimensions and Weight
Select the laboratory bench space before the system arrives. Pay
special attention to the total height requirements. Avoid bench
space with overhanging shelves. See Table 1.
Power Consumption
The 7693A injectors draw power from the GC. No other power
source is required.
Table 1 Required height, width, depth, and weight
Product Height (cm) Width (cm) Depth (cm) Weight (kg)
G4513A Injector 51 16.5 16.5 3.9
Additional space requirements
• GC with 7693A ALS injector Requires 50 cm (19.5 in) above the GC