Installing the GC 1
Agilent Intuvo 9000 GC Installation 47
Connect gases to the GC.
Plumb to EPC flow modules
Purge the supply lines for a few minutes before connecting them
to the GC flow modules.
If sharing carrier gas between an inlet and a detector, we
recommend using a Tee fitting that includes shutoff valves for
performing leak tests.
Figure 7 Example Tee with shutoff valves
Carrier gas
Detector gases
33 mm = ~ 1 5/16 inches
33 mm = ~ 1 5/16 inches
60 mm = ~ 2 1/4 inches