INSTALLATION GUIDELINES
15 of 38
www.alfalaval.com
3) Pre-commissioning
Pre-commissioning is the phase where a system or unit is prepared for the
commissioning. The purpose of the pre-commissioning is to verify and
check if all parameters necessary for the operation are in accordance with
the specifications.