GRID
High Voltage Switchgear
PS 0002EN
03 1996-03-18 2011-03-21 3 / 3
Sheet N° Revision 1st issue Revision date Page
SAFETY INSTRUCTIONS
PACKING
TRANSPORT
INSTALLATION
START-UP
OPERATION
MAINTENANCE
SCRAPPING &
RECYCLING
Handling of insulating jackets at transport pressure (300
hPa maximum).
X X X
Ensure that cases have not been damaged during
handling or prolonged storage.
X
Follow the stacking instructions.
X X X
It is essential to open cases from the top and to take
care when unpacking.
X
Before handling any hydraulically operated
component, bring oil pressure back to atmospheric
pressure.
X X
Before handling any mechanically operated
component, disable the springs.
X X
Bring insulating jacket working pressure back to
transport pressure (300 hPa maximum).
X X