EasyManua.ls Logo

Amano OPU Series - Checking Bank Note Acceptor Firmware; Accessing the Coin Vault

Amano OPU Series
49 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© Copyright 2014 Amano McGann, Inc. OPUS7000_Installation_10032014 22
OPUS-7000 Installation Manual
2.5.1 Checking Bank Note Acceptor Firmware
The back of the Bank Note Acceptor contains the BNA firmware version on
the placement card.
1. Remove the Bank Note Acceptor.
2. Pull the Placement Card out of the back of the BNA to see the full firmware
version.
3. Insert the Placement Card back into the Placement slot when finished
[Fig 2.5B] The Placement Card contains the firmware version number
4. Re-Insert the Bank Note Acceptor
2.6 Accessing the Coin Vault
1. Open the Paystation door.
2. Insert the ‘66’ key into the vault lock.
3. Push the key in and simultaneously rotate the key 90 degrees to the
left/counter-clockwise.
4. Pull out the coin vault.
5. Insert the coin vault key and simultaneously push down and rotate the key
counter-clockwise.

Related product manuals