5 Installation at Site
26 of 124
Amarex KRT
5.3.1 Stationary wet installation
5.3.1.1 Fastening the flanged elbow
Fastening the base elbow with foundation rails and chemical anchors
UG1046374
72-1
89-8.38
89-8.39
901.38
550.38
904.39
90-3.39
Fig.9: Fastening the base elbow with foundation rails and chemical anchors
1. Position base elbow 72-1 with foundation rails 89-8.38/.39 at the bottom of the
tank/well.
2. Insert chemical anchors 904.38.
3. Use chemical anchors 904.38 to bolt base elbow 72-1 with foundation rails
89-8.38/.39 to the floor.
4. Set the foundation rails in concrete.
Chemical anchor
dimensions
Fig.10: Dimensions
Table9: Chemical anchor dimensions [″]
Size
(d
1
×l
1
)
d
2
t
1
t
2
SW
1
7)
SW
2
7)
M
d1
[
″
] [
″
] [
″
] [
″
] [
″
] [ft lb]
15
/
16
×11
13
/
16
″
8)
1
1
/
8
2
9
/
16
8
1
/
4
1
7
/
16
11
/
16
132,76
1
3
/
16
×14
15
/
16
″
8)
1
3
/
8
2
9
/
16
11 1
13
/
16
- 295,02
Table10: Chemical anchor dimensions [mm]
Size
(d
1
×l
1
)
d
2
t
1
t
2
SW
1
7)
SW
2
7)
M
d1
[mm] [mm] [mm] [mm] [mm] [Nm]
M24×300
8)
28 65 210 36 17 180
M30×380
8)
35 65 280 46 - 400
7) SW = Width across flats
8) Mounting accessories of the respective manufacturer are required.