M32 FLYWHEEL
INSTALLATION & MAINTENANCE
MANUAL
v2.0
March, 2018
Question and Answer IconNeed help?

Do you have a question about the Amber M32 and is the answer not in the manual?

Summary

Disclaimer

1 - Introduction

1.1 - About this Manual

Describes the formatting conventions and information contained within the manual.

1.2 - About Amber Kinetics

Provides information about the company Amber Kinetics and its mission.

1.3 - M32 Flywheel Description

Details the components and assembly of the M32 Flywheel Module.

1.4 - Theory of Operation

Explains how the M32 flywheel stores and discharges kinetic energy.

1.5 - Specifications & Performance

Lists mechanical, environmental, and electrical specifications for the M32 flywheel.

1.6 - Safety Features

Outlines Amber Kinetics' five-step approach to flywheel safety.

2 - Safety

3 - Installation

3.1 - Planning

Details site planning and clearance requirements for multi-M32 flywheel installations.

3.2 - Equipment & Tools

Lists the necessary equipment and tools required for installing the M32 flywheel.

3.3 - Site Preparation

Outlines procedures for preparing the installation site and excavation hole.

3.4 - Capsule Placement

Describes how to properly hoist and backfill the Capsule into the installation hole.

3.5 - M32 Flywheel Preparation

Details the steps for adjusting the jack screw and preparing the flywheel before placement.

3.6 - M32 Flywheel Placement

Explains how to lower and secure the M32 flywheel within the Capsule.

3.7 - Electrical Connections

Guides through making the necessary electrical connections for the M32 flywheel.

3.8 - Completing the Installation

Covers final steps like inspection, backfilling, and installing the Capsule Lid.

4 - Testing and Commissioning

4.1 - Pre-Commissioning Steps

Verifies completion of installation steps and conducts a visual inspection.

4.2 - M32 Flywheel Spin-up

Details the M32 flywheel spin-up process, including startup and testing phases.

5 - Maintenance

Amber M32 Specifications

General IconGeneral
BrandAmber
ModelM32
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals