M32 FLYWHEEL - INSTALLATION & MAINTENANCE MANUAL
4.1 - Pre-Commissioning Steps
Review “Installation” on page 15, and verify that all
steps have been completed. Conduct a visual
inspection of the installed M32 flywheel(s), paying
particular attention to the following:
• Each M32 flywheel is properly secured to its
Capsule.
• All electrical and communications connections to
the M32 flywheel(s) have been completed in
accordance with the instructions in this manual.
• There is no debris in the Capsule(s).
• Station power and network communications are
available to the M32 flywheel(s).
WARNING: DO NOT ENERGIZE THE DC
BUS AT THIS TIME.