EasyManua.ls Logo

Amber M32 - 3 - Installation

Amber M32
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Copyright 2018 by Amber Kinetics. All rights reserved.
15
3 - Installation
This chapter describes the installation procedure for the M32 flywheel. This
process begins with planning the installation, gathering the needed equipment
and tools, and then preparing the site. Next, the M32 flywheel is installed in the
ground and electrical connections are made. Finally, a vacuum pump is
connected to the M32 flywheel(s) to ensure a proper level of vacuum inside
the Flywheel Housing, and the site-wide wiring is completed.

Related product manuals