Move the FrameMove the Frame
Move the FrameMove the Frame
Move the Frame
1. Plan the Route - Make sure all passages are large enough to
accommodate the frame and the pallet jack. Check to see that
the floor has sufficient strength. See Table 3-1 for weights and
dimensions. Check doorways, elevators, ramps, etc, to insure
there are no non-negotiable corners, step-ups, or offsets. Se-
lect a route that provides the smoothest possible floor surface.
2. Staging Area - A smooth, level floor surface is required to
position the frame pallet, to remove the packaging materials,
and to install the ramp. It must provide adequate space for
two people to carefully roll the frame down the ramp and onto
the floor. See Figure 3-1 below for staging area dimensions.
3. Using the Pallet Jack - Carefully move the frame to the
staging area.
Fig 3-1 Staging Area
Initial InspectionInitial Inspection
Initial InspectionInitial Inspection
Initial Inspection
The Symmetra
TM
Power Array system is shipped on pallets.
The system frame is bolted to one pallet, and the modules are
boxed and stacked on one or two additional pallets.
Check For Damage
1. Inspect the Packaging - for damage or signs of mishan-
dling before moving the pallets. If damage is detected, note it
on the Bill of Lading.
2. If Any Damage Is Detected - file a damage claim with the
shipping agency within 24 hours. Inform APC of the damage
claim and the condition of the equipment.
3. System Administrator- make sure the system administra-
tor participates in the initial inspection.
artemmySartemmyS
artemmyS
artemmySartemmyS
MTMT
MT
MTMT
tnenopmoCtnenopmoC
tnenopmoC
tnenopmoCtnenopmoC
snoisnemiDsnoisnemiD
snoisnemiD
snoisnemiDsnoisnemiD
mcHxDxW
)sehcni(
thgieWthgieW
thgieW
thgieWthgieW
)bl(gk
emarFiniM
6
x1
6.86
x
7.87
)"13x"72x"42(
gk631
(
bl003
)
emarFretsaM
16
6x
6.8
x
1.231
(
)"25x"72x"42
gk632
(
bl025
)
yrettaB
eludoM
9.22
5x
.0
2.51x8
(
)"6x"02x"9
gk82
(
bl06
)
eludoMrewoP
4.52
x
8.05
x
2.51
(
"6x"02x"01
)
gk61
(
bl53
)
Table 3-1 Dimensions and Weights
Handling Considerations
1. The Frame Pallet - See Table 3-1 for frame weight and
dimensions. Before removing shipping materials, the frame
and pallet should be positioned as closely as possible to the
installation site. The frame is bolted to the pallet. It is re-
moved from the pallet using a ramp that is included. Use a
pallet jack to position the frame pallet.
Note: Do not attempt to move the frame with a hand dolley.
2. The Modules Pallet - Position the modules pallet(s) as
closely as possible to the final installation site with the pallet
jack. If this is not possible, remove the outer packaging mate-
rials and carry each individual, boxed module to the installa-
tion site.