Chapter 3 - Unpacking and Installing Frame
Remove Packing MaterialsRemove Packing Materials
Remove Packing MaterialsRemove Packing Materials
Remove Packing Materials
Note: Temporarily store all packaging materials in case any of
the system components must be returned to APC.
1. Remove the Shipping Bands - Using appropriate precau-
tions, cut the plastic shipping bands.
2. Remove the Cardboard - Using care not to damage the
surface of the Power Array, remove the cardboard from the
frame. Save the electrical installation instructions that are
printed on the packaging material.
3. The Pallet Ramp - The pallet ramp is shipped under the
cardboard cap on top of the frame. Cautiously remove the
ramp from the top of the frame.
4. Remove the Cover Grills - Remove the grill covers from the
frame. Grasp a grill cover by the side finger hold, and pull
straight forward. Set the covers to one side. Do not scratch
them.
5. Leveling Feet - Fully retract each of the four leveling feet
located near the casters on the bottom of the frame.
Fig 3-2 Frame Restraint and Ramp Holes
Remove the Frame frRemove the Frame fr
Remove the Frame frRemove the Frame fr
Remove the Frame fr
om the Palletom the Pallet
om the Palletom the Pallet
om the Pallet
1. Loosen Rear Bracket Screws - Loosen the two phillips-
head screws securing the brackets at the rear of the frame.
2. Remove Two Frame Restraint Screws - See Figure 3-2.
Remove the frame restraint screws. Use the cloth handle to
remove the frame restraint from the pallet. Place the frame
restraint and two screws aside.
3. Install the Ramp - Position the ramp so that the installation
bolts line up with the ramp bolt holes on the pallet. Install the
ramp onto the pallet as shown in Figure 3-3.
Fig 3-3 Frame Pallet Ramp
4. Roll the Frame from the Pallet - The following operation
requires two people. Holding the frame near the center, care-
fully roll it down the ramp and onto the floor. (The frame is
equipped with casters.)
5. Roll the Frame to the Installation Site - Carefully roll the
frame from the staging area to the final installation site.
6. Shipping Material Storage - Gather and store all shipping
materials.
Moving Battery & Power ModulesMoving Battery & Power Modules
Moving Battery & Power ModulesMoving Battery & Power Modules
Moving Battery & Power Modules
1. Move Battery and Power Modules On Pallet - Use the
pallet jack to move the modules pallet(s) to the installation
site. Remove the outer packaging materials.
2. Stack Modules - Carefully stack the boxed battery and
power modules near the installation site. Leave adequate space
for the electrican to install wiring to the frame.
Frame
Restraint
Ramp
Holes