q 6. Press the Down arrow key to scroll to the power mod-
ule status screen.
Fig 5-20 Power Module Status Screen
Verfiy the following:
q Total Pwr modules (power modules) reported is
the same as the actual number of power modules
that are installed.
q Bad power modules reported is 00 (zero).
q The first line of the power module status screen
displays the reported capacity of the Symmetra
TM
.
The reported capacity is based on the number of
power modules installed and the size of the frame.
See table 5-1 to confirm that the PowerView is
reporting the correct information.
rewoPrewoP
rewoP
rewoPrewoP
seludoMseludoM
seludoM
seludoMseludoM
dellatsnIdellatsnI
dellatsnI
dellatsnIdellatsnI
detropeRdetropeR
detropeR
detropeRdetropeR
niyticapaCniyticapaC
niyticapaC
niyticapaCniyticapaC
emarFiniMemarFiniM
emarFiniM
emarFiniMemarFiniM
detropeRdetropeR
detropeR
detropeRdetropeR
niyticapaCniyticapaC
niyticapaC
niyticapaCniyticapaC
emarFretsaMemarFretsaM
emarFretsaM
emarFretsaMemarFretsaM
1AVk4AVk4
2AVk8AVk8
3AVk8AVk21
4a/nAVk61
5a/nAVk61
Table 5-1 Symmetra
TM
Power Module/Frame Capacities
q 7. Press the Down arrow key to scroll to the miscella-
neous status screen. The bottom line indicates the status of
the Main Intelligence Module (MIM) and the Redundant In-
telligence Module (RIM). The sample screen in figure 5-21
indicates that both are installed and functioning properly
(OK). If a module is not installed, the status screen will dis-
play the word NONE. Confirm that the IM and RIM status
are correct. Use the ESC key to return to the startup screen.
Fig 5-21 Miscellaneous Status Screen
q 8. Follow these steps to deliver output voltage to the
load equipment. See figure 5-22 for the screen sequence:
Note: It is recommended that load equipment be switched off
while this step is performed. After output voltage is delivered,
switch the load equipment on.
q Press the ESC key until the startup screen appears.
q Press the Enter key to display the top level menu.
q Press the Down key until the selection arrow points
to the Control menu item.
q Press the Enter key.
q Press the Down key, until the selection arrow
points to Turn Load ON.
q Press the Enter key.
q Confirm that you want to turn the load on, by
selecting YES, Turn UPS ON
q Several other over-ride messages may appear,
depending on the system configuration. Select Start
Now for any of these startup over-ride messages.
Fig 5-22 Power The Load Sequence
After several seconds, the PowerView display should report
that the UPS LOAD IS ON. Press the ESC key to return
to the startup screen. Confirm that output voltage is present
and that the Load On LED indicator is glowing.
Note: The Bypass LED indicator may flash on briefly, and the
On Battery LED indicator may glow for 20-30 seconds if the
system is configured for self test at power on.
q 9. Perform a self test by following the screen sequence in
figure 5-23.
Fig 5-23 Initiate a Self Test Sequence
The On Battery LED indicator should glow for approximately
30 seconds. A message will appear on the display indicating
that a self test is in progress. When the Self Test Complete
message appears, press any key to return to the startup screen.
5-8