Pre-Installation Preparation
2 Removing the Existing Differential
Removing the Axles and Differential
Checking the Current Backlash Amount
Removing the Differential Carrier
3 Installing the Air Locker
Installing the Carrier Bearings
Drilling and Tapping the Bulkhead Port
Checking for Assembly Clearance
Final Air Locker Assembly
Installing the Seal Housing
Setting up the Bulkhead Fitting
Profiling the Seal Housing Tube
Bench Testing the Air Locker
Reinstalling the Differential & Axles
4 Installing the Air System
Running & Securing the Air Line
Connection to the Bulkhead Fitting
5 Mounting & Connecting the Electrical System
Mounting the Actuator Switch(es)
Wiring the Actuator System
6 Testing & Final Assembly
Testing the Air Locker Actuation
Post-Installation Check List
Exploded Assembly Diagram