EasyManua.ls Logo

Argus green stream 707 - Appendix; Safety Standard Check Form

Argus green stream 707
38 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
APPENDIX
14.164.A_A707en.SM.V1.01.doc ARGUS Medical AG 10.02.04 AS 38 / 38
10. APPENDIX
Safety standard check (SSC)
ARGUS 707 ARGUS Medical AG
Serial-no.: ……………………………….………….. Inventory-no:.……………………..……………….
Hospital: ………………..……………………………………………………………………..
Department: ………………..……………………………………………………………………..
Customer: ………………..……………………………………………………………………..
The SSC has to be performed at least every 24 months or after 10'000 hours of operation. The check has to be
done in accordance to the user- and service manuals.
1
Visual check for damage, cleanness and completeness - Housing, labels, accessories, connectors, power
cable, etc.
2
Test the function of the stop flow clamp - Proper movement of the clamp
3
Keep "MODE" pressed while switching on the pump - Display pump type and software release
- Display of 2, 4, 7, F., in numeric display
- Display of all operation- and alarm indicators
4
Connect/Disconnect the pump to the mains - The indicator “external supply” lights up
5
Test the drop detector by simulating drops - Check the green “drop” indicator
6
Test the door switch, open and close the door - Door open the “door” indicator lights up
- Door close the “door” indicator turns off
7
Open the door and remove any IV-set - Indicator “air bubble” lights up
8
Install a water filled IV-set, close the door - Indicator “air bubble” turns off
9
Set rate to 333.3 m/h, press "START", disconnect the
drop detector
- The red indicator “drop” lights up (delayed)
- The acoustical alarm turns on
10
Press "MODE" - The acoustical alarm mutes
11
Check the external connector “nurse call” - Relay contact switches (see chapter 9)
12
Calibration of the pressure sensors
IV-set type used:
Codan……… Other……………..………………….
- See chapter 5.3 and 5.4 of the service manual
13
Volume calibration - See chapter 5.5 of the service manual
14
Charge the battery while the pump is running 16
hours, at a rate of 30.0 ml/h
- The indicator “external supply” must light
15
Battery check at a rate of 30 ml/h.
Run the battery test until the pump switches
off automatically
- The green indicator “battery” lights up during this
test
16
Printout the pump history (refer to chapter 3.4) - Check the battery run time by checking the latest
history entries, > 4h 30min
- Check the pump internal time and date
17
Electrical test according to EN60601-1
(all measurements made with a power cable 2.5 m)
- Measurements attached
18
Charge the battery after this test!
The pump has passed the SSC and is safe for use
Date: ………………..……………………………………………………………………..
Name: ………………..……………………………………………………………………..
Signature: ………………..……………………………………………………………………..