EasyManua.ls Logo

Ariens 921024 - Page 15

Ariens 921024
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN - 15
16. Orient the chute and pedestal to its most
vertical position and tighten pedest
al
ha
rdware to 15 – 31 lbf-ft (20 – 42 N•m).
17. Make sure the discharge chute rotates
left and right when you push t
he
dis
charge chute control lever left
and
ri
ght.
NOTICE: If chute does not stay in position,
adjust as directed in Discharge Chute on
page 31 or repair before operation.
Remote Deflector Control
(Figure 15)
NOTICE: Connect the barrel cable end to the
chute deflector cable anchor before clipping
the cable to the discharge chute cable
bracket.
1. Route deflector cable along the left
side
of
the chute pedestal.
2. Insert the barrel cable end into th
e
br
acket on left side of chute deflector
(Figure 15).
3. Hold seal out of the way while rout
ing
t
he cable through the bracket on the left
side of the discharge chute, and then
push the cable fitting into the bracket.
4. Push the seal securely over the end of
the cable fitting to prevent water from
entering the cable.
5. Check deflector travel. Adjust nut
on
cable end under control panel to obtain
full travel, if necessary (see Remote
Deflector Control Adjustment on
page 30).
.
Install Skid Shoes
(Models 921029, 032)
(Figure 16)
1. Remove hardware from skid shoes.
2. Install hardware through blower
housing
and skid shoe as shown.
3.
Adjust skid shoes (see Skid Shoes
on
p
age 30).
Check Function of Dual Handle
Interlock
Without the engine running, press down
(engage) both clutch levers. Release
attachment clutch lever. Attachment clutch
should remain engaged until traction clutch
lever is released, then both clutches must
disengage. If they do not, contact your Dealer
for repairs.
Check Tire Pressure
(Models 921023, 024, 030, 032, 035,
036, 037)
Check tire pressure and adjust to the
pressure listed on tire sidewall.
Figure 15
1. Chute Deflector Cable Anchor
2. Barrel Cable End
3. Deflector Cable
4. Cable Fitting
5. Discharge Chute Cable Bracket
1
2
3
5
4
3
Figure 16
2
3
1. Bolt, Round Head Square Neck
.38-16 x 1.00
2. Skid Shoe, Reversible
3. Washer, Flat Steel .438 x 1.00 x .083
4. Nut, Locking, Center, .38-16
1
4

Related product manuals